Driveway Paver Calculator
Plan a paver driveway: number of pavers and pallets, how deep to dig, tons of gravel base and sand for your soil, edge restraint, and a typical installed price — plus a check of your contractor’s quote per square foot.
About 10–12 ft for one car, 20–24 ft for two side by side.
2⅜″ (60 mm) pavers are the industry recommendation for residential driveways; 3⅛″ (80 mm) is for heavier traffic.
Industry minimum: 6″ on well-drained soil, 6–8″ typical; deeper on clay or in cold climates.
%
USD
Enter a quote to see its price per square foot.Results
- Driveway area
- 480
- Pavers
- 2,376 (≈ 7.58 tons)
- Pallets (≈ 100–120 ft² each)
- about 5
- Excavation depth
- 11.4″ (8″ base + 1″ sand + 2.38″ paver)
- Soil to remove
- 16.9 yd³ in the ground ≈ 21.1 yd³ loose (≈ 2 dump-truck loads)
- Gravel base
- 19.9 tons (11.9 yd³ compacted)
- Bedding sand
- 2 tons (1″ layer)
- Edge restraint
- 92 ft
- Typical installed price
- $4,800 – $9,600 ($10–$20/ft², standard concrete pavers)
🛒 Shopping list
| Item | Qty | Price each ($) | Cost |
|---|---|---|---|
| 4″ × 8″ driveway pavers, 60 mm | 2376 pavers | $1,663.20 | |
| Crushed stone base (¾″ minus / dense-graded), bulk Includes ≈ 20% extra for compaction | 20 tons | $900.00 | |
| Concrete / bedding sand, bulk | 2 tons | $100.00 | |
| Paver edge restraint, 8 ft + spikes | 12 pieces | $168.00 | |
| Polymeric joint sand, 50 lb | 10 bags | $300.00 | |
| Plate compactor rental, per day Reversible plate compactor (≈ 7,000 lbf) for the base | 2 days | $220.00 | |
| Estimated materials total | $3,351.20 | ||
Prices are rough US starting points, not quotes — type in your local store’s prices. Taxes and delivery not included.
💡 Materials only come to roughly $2,659 for pavers, base and sand — the rest of an installed price is excavation, hauling, equipment and labor. Prices vary by region; edit them to match your supplier.
💡 Paver tonnage assumes concrete at about 145 lb/ft³. Tons of base and sand are for bulk delivery — confirm the truck can reach the site and won’t crack an existing sidewalk.
💡 Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
How to do it
Difficulty: AdvancedTime: 1–2 weeks DIY; 2–4 days for a crew
Tools you’ll need
- Skid steer or mini excavator (rent) for digging
- Reversible plate compactor, ≈ 7,000 lbf (rent)
- Screed rails & straightedge
- Masonry saw with diamond blade (rent)
- String line, stakes & line level
- Wheelbarrow, shovels, rakes
Steps
- Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
- Mark the driveway and dig to the excavation depth above. Slope the subgrade at least 2% (¼″ per foot) away from the garage and house so water drains off.
- Compact the soil subgrade. On clay or wet soil, lay geotextile, overlapping seams at least 12″.
- Spread the crushed-stone base in 4–6″ layers (thinner with a lighter compactor) and compact each layer — compaction is what keeps a driveway from rutting.
- Install edge restraint along the edges, then screed 1″ of bedding sand flat (don’t compact or walk on it).
- Lay pavers from a straight edge; 45° or 90° herringbone patterns resist tire creep best. Cut edge pieces, compact the pavers, sweep in joint sand and compact again.
Common mistakes
- Too little base or poor compaction — the main cause of ruts and sunken wheel tracks.
- Edge restraint left out where tires run near the edge — pavers creep outward.
- No slope — water sits under the driveway and freezes.
👷 When to call a pro: Driveways carry cars and need heavy equipment, a permit in many towns (especially where it meets the street), and accurate grading. Most homeowners hire this out — use the numbers here to check a quote.
Formula
Pavers = area × pavers per ft² × (1 + waste); dig depth = base + 1″ sand + paver thickness; base tons = area × base depth × 1.4 t/yd³ × 1.2 (compaction); installed cost ≈ area × $10–$20/ft²