Paver & Patio Calculator
Plan a paver patio or walkway: number of pavers, tons of gravel base, bedding sand, edge restraint and polymeric sand, with a cost estimate.
4–6″ for patios and walkways; 8–12″ for driveways.
%
Results
- Patio area
- 192
- Pavers
- 951
- Gravel base
- 2.37 yd³ ≈ 3.32 tons
- Bedding sand
- 0.593 yd³ ≈ 0.8 tons
- Edge restraint
- 56
🛒 Shopping list
| Item | Qty | Price each ($) | Cost |
|---|---|---|---|
| 4″ × 8″ pavers | 951 pavers | $665.70 | |
| Crushed stone base (¾″ minus), bulk Or ≈ 128 bags of 0.5 ft³ | 4 tons | $180.00 | |
| Concrete / bedding sand, bulk Or ≈ 32 bags of 50 lb | 1 tons | $50.00 | |
| Paver edge restraint, 8 ft + spikes | 7 pieces | $84.00 | |
| Polymeric joint sand, 50 lb | 4 bags | $120.00 | |
| Landscape fabric (3 × 50 ft roll) | 2 rolls | $40.00 | |
| Estimated materials total | $1,139.70 | ||
Prices are rough US starting points, not quotes — type in your local store’s prices. Taxes and delivery not included.
💡 Tons are for bulk delivery (crushed stone ≈ 1.4 t/yd³, sand ≈ 1.35 t/yd³). Compacted base needs about 20% more material than its finished depth — order a little extra.
💡 Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
How to do it
Difficulty: ModerateTime: 2–3 weekends
Tools you’ll need
- Shovel & wheelbarrow
- Plate compactor (rent)
- Screed rails (1″ pipe) & a straight 2×4
- Masonry saw or splitter (rent)
- Rubber mallet
- String line & line level
Steps
- Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
- Mark the area, excavate to base depth + sand + paver thickness, and slope it ⅛–¼″ per foot away from the house.
- Lay landscape fabric, then spread and compact the gravel base in 2″ layers with a plate compactor.
- Screed 1″ of bedding sand flat over pipes — don’t compact it.
- Lay pavers from a straight edge in your pattern without walking on the sand; cut the edge pieces.
- Install edge restraint, compact the pavers, sweep in polymeric sand, compact again and mist it to set.
Common mistakes
- Skimping on base depth or compaction — pavers sink and rock.
- No slope — water pools against the house.
Formula
Pavers = area × pavers per ft² × (1 + waste); base gravel tons = area × depth × 1.4 t/yd³; sand tons = area × 1″ × 1.35 t/yd³