Here is an appealing idea: give every data center its own ice factory. Freeze water when it’s easy, melt it when the servers are hottest, and stop evaporating millions of liters of water. Ice storage is a real technology — but the physics decides when it helps and when it doesn’t. This guide works through the numbers.

The catch: ice moves heat, it doesn’t destroy it

Making ice is itself refrigeration. A chiller pulls heat out of water until it freezes, and that heat — plus the electricity the compressor uses — has to be dumped outdoors. So an ice plant doesn’t remove the need to reject heat; it changes when and how you do it. That is exactly where its value lies.

How much ice it takes

Melting ice absorbs 334 kJ per kilogram, so each kWh of heat melts about 10.8 kg of ice. For a 100 MW data center:

Cover the full load for…Ice neededVolume
4 peak afternoon hours≈ 4,300 tonnes≈ 4,700 m³ — about 1.9 Olympic pools
A whole day≈ 25,900 tonnes≈ 28,200 m³ — about 11 Olympic pools

Freezing and melting that much every day is possible — large ice-storage tanks exist — but covering a few peak hours is far more practical than running a data center on ice around the clock. Try other sizes in the ice thermal storage calculator.

The energy cost

To freeze water a chiller must run colder, which lowers its efficiency (its coefficient of performance, COP). With illustrative values of COP 3.5 for ice-making and COP 6 for an ordinary chilled-water plant, covering 4 hours of a 100 MW load takes about 114,000 kWh of electricity as ice versus about 67,000 kWh with chilled water — roughly 70% more. Tanks also lose some cold over time.

When ice actually saves water

The water saving depends entirely on how the ice-making heat is rejected:

  • With cooling towers: you evaporate water for the load and for the extra compressor work — about 1.9 liters per kWh cooled, more than cooling directly. No saving.
  • With dry coolers at night: cool night air can absorb the heat with no evaporation at all. Freeze at night with dry coolers, melt during the hot afternoon instead of running evaporative towers — that is where water is saved.

Where ice storage shines

  • Hot, dry regions with cool nights — deserts and high plateaus — where daytime evaporative cooling is most water-hungry and night air is cold.
  • Grids with cheap or clean power at night (often wind) — make ice when electricity is cheap and low-carbon, cut demand in the expensive afternoon peak.
  • Backup cooling — stored ice or chilled water keeps servers cool for minutes to hours if chillers fail or power switches to generators.
  • Buildings with big daily peaks — offices, campuses and stadiums have used ice storage for decades for exactly this reason.

Where it doesn’t

  • Data centers run near full load 24 hours a day, so there is no quiet night period with spare cooling capacity, as offices have.
  • In humid climates with warm nights, dry coolers struggle, so the ice plant falls back on water-hungry cooling towers.
  • Every kWh of cooling via ice costs more electricity — and if that electricity comes from thermal power plants, the water used to generate it can outweigh what was saved on site.

The verdict

“An ice factory at every data center” is too strong — but thermal storage at the right data centers is a genuinely useful idea. Where nights are cool and night-time power is clean, freezing ice (or chilling water) with dry coolers and using it to shave the hottest hours can cut both water use and peak power demand. It works best as one part of a strategy alongside cooler sites, closed-loop liquid cooling, recycled water and clean electricity — see how much water data centers use.

Efficiency figures (COP) are illustrative; real systems vary with design and climate. Use the calculator to test your own assumptions.

Frequently asked questions

Can ice be used to cool data centers?

Yes, as thermal storage: ice or chilled water is made when conditions are favorable and melted to cool servers during peak hours or emergencies. It shifts cooling in time rather than eliminating it, because making ice requires refrigeration that rejects heat outdoors.

How much ice would it take to cool a data center?

Each kWh of heat melts about 10.8 kg of ice. Covering a 100 MW data center for 4 hours takes about 4,300 tonnes of ice; covering it for a full day would take about 25,900 tonnes.

Does ice storage save energy?

Usually not in total — making ice requires colder, less efficient chillers, often using considerably more electricity than chilled water. Its benefits are shifting demand to off-peak hours, using cheaper or cleaner night-time power, and saving water when night-time heat rejection uses dry coolers.

Does ice storage save water?

Only if the heat from making the ice is rejected without evaporation, for example with dry coolers on cool nights. If the ice plant uses evaporative cooling towers, it evaporates more water than cooling the servers directly.

Sources

Written by Pramod Parnati, Founder, Calculator Suite. Published November 19, 2026. Found a mistake? Every number in this guide can be checked with the linked calculators — and we’ll fix anything that’s wrong.

More guides