Deck Calculator
How many deck boards, joists, hangers and screws do you need? Enter your deck size to get a shopping list, a material cost estimate and step-by-step building tips.
%
Results
- Deck area
- 192
- Deck boards
- 29 × 16 ft
- Rows of boards
- 26
- Joists
- 13 × 12 ft (2x8)
- Deck screws
- ≈ 676
🛒 Shopping list
| Item | Qty | Price each ($) | Cost |
|---|---|---|---|
| 5/4×6 PT deck boards, 16 ft | 29 boards | $649.60 | |
| 2x8 PT joists, 12 ft | 13 boards | $249.60 | |
| 2x8 PT ledger & rim joist, 16 ft | 2 boards | $51.20 | |
| Joist hangers (2x8) | 13 hangers | $26.00 | |
| Deck screws, 2½″ (box ≈ 350) | 2 boxes | $76.00 | |
| Ledger flashing tape / Z-flashing | 2 rolls/pieces | $50.00 | |
| Estimated materials total | $1,102.40 | ||
Prices are rough US starting points, not quotes — type in your local store’s prices. Taxes and delivery not included.
💡 Posts, beams and footings are not included — they depend on deck height and your local code. Use the post hole concrete calculator for the footings.
💡 Boards span the full length — no butt joints needed.
How to do it
Difficulty: AdvancedTime: 2–4 weekends
Tools you’ll need
- Circular saw & miter saw
- Drill / impact driver
- 4 ft level & string line
- Post-hole digger or auger
- Speed square & tape
- Safety glasses & hearing protection
Steps
- Check permits, setbacks and HOA rules. Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
- Attach a ledger board to the house rim joist with structural screws or lag bolts, with flashing above it to keep water out.
- Lay out the footings with string lines (check square with the 3-4-5 method), dig below the frost line and pour the footings.
- Set posts and beams, then hang the joists from the ledger with joist hangers at your chosen spacing.
- Install decking with an even gap, screwing twice into every joist; stagger butt joints and land them on a joist.
- Add stairs and a railing — most codes require a guard when the deck is more than 30″ above the ground.
Common mistakes
- Skipping ledger flashing — the #1 cause of rotted rim joists and deck collapses.
- Butt joints that don’t land on a joist.
- Using nails instead of joist-hanger nails or structural screws in hangers.
👷 When to call a pro: Attached decks carry heavy loads and are a common cause of injuries when they fail. Most places require a permit and inspection — and a pro for decks high off the ground.
Formula
Rows = depth ÷ (board width + gap); decking ft = rows × length; joists = length ÷ spacing + 1; screws = 2 per board per joist