Retaining Wall Block Calculator
Retaining wall blocks, cap blocks, base gravel and drainage stone for a segmental block wall — with how deep to bury the first course and when a wall needs geogrid or an engineer.
Results
- Wall blocks
- 284 (9 courses × 30 per course, + 5%)
- Block weight
- ≈ 3.55 tons — plan delivery
- First course buried
- 6″ below grade (at least 6″, or 1″ per 8″ of wall height)
- Trench
- 24″ wide × 12″ deep (6″ gravel base + buried course)
- Base gravel (¾″ crushed, compacted)
- 1.11 yd³ ≈ 1.56 tons
- Drainage stone behind the wall (¾″ clean)
- 3.33 yd³ ≈ 4.5 tons (12″ zone, full height)
- Cap blocks
- 32
🛒 Shopping list
| Item | Qty | Price each ($) | Cost |
|---|---|---|---|
| Retaining wall block (4″ × 12″ face) | 284 blocks | $994.00 | |
| Crushed stone base, ¾″ minus (bulk) | 2 tons | $90.00 | |
| Clean drainage stone, ¾″ (bulk) | 5 tons | $250.00 | |
| Non-woven landscape fabric, 3 × 50 ft Separates the drain stone from the soil behind | 2 rolls | $60.00 | |
| Paver base leveling sand, 0.5 ft³ bag Optional ½″ leveling layer under the first course | 3 bags | $18.00 | |
| Cap blocks | 32 caps | $160.00 | |
| Concrete/landscape block adhesive, 10 oz | 3 tubes | $24.00 | |
| 4″ perforated drain pipe with sock, 10 ft Run to daylight at one or both ends | 4 lengths | $60.00 | |
| Estimated materials total | $1,656.00 | ||
Prices are rough US starting points, not quotes — type in your local store’s prices. Taxes and delivery not included.
⚠️ Slopes or a driveway above the wall, or a wall holding back wet clay, add a lot of pressure — those walls need engineering even when short.
💡 Block sizes and weights vary by brand — check the face size on the pallet. Gravel weights: crushed base ≈ 1.4 t/yd³, clean stone ≈ 1.35 t/yd³.
💡 Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
How to do it
Difficulty: AdvancedTime: A weekend for a 30 ft × 2 ft wall
Tools you’ll need
- Shovel, mattock
- Plate compactor or hand tamper
- 4 ft level & torpedo level
- String line & stakes
- Rubber mallet
- Masonry saw or chisel for cuts
Steps
- Call 811 (or your local utility-locate service) a few days before digging — it’s free and required in most places.
- Dig the trench: wide enough for the block plus 12″ behind it, and deep enough for 6″ of base plus the buried course.
- Compact the soil, add base gravel in 2–3″ layers and compact each; screed it perfectly level — the first course sets the whole wall.
- Set the first course on the base, level front-to-back and side-to-side. This is the slow part; take your time.
- Backfill behind with drainage stone as you go (with fabric between stone and soil); lay the drain pipe behind the first course.
- Stack the next courses with joints staggered (running bond); sweep each course clean. Add geogrid where the design calls for it.
- Glue the caps on with block adhesive; top the last 6–8″ behind the wall with soil to keep surface water out of the stone.
Common mistakes
- A base that isn’t compacted or level — the wall leans or bellies out.
- Backfilling with dirt instead of clean stone — water pressure pushes walls over.
- Too tall without geogrid.
👷 When to call a pro: Walls over 4 ft, walls supporting a driveway, building or steep slope, and tiered walls need an engineer and usually a permit.
Formula
Courses = (exposed height + buried depth) ÷ block height; blocks = courses × wall length ÷ block length; base = length × 2 ft × 6″; drain stone = length × 1 ft × total height